Prof. Ir Mochammad Agung Wibowo, M.Sc., M.M., Ph.D

Biography

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Faktor penerapan normatif green construction pada pembangunan the alton apartemen

S4

WAHANA TEKNIK SIPIL: JURNAL PENGEMBANGAN TEKNIK SIPIL , Vol 27, No 1 (2022): Wahana Teknik Sipil , pp. 65 - 75

2022

0 cited

Pembuatan biopori sebagai upaya peningkatan laju infiltrasi dan cadangan air tanah serta pengendalian banjir

NA

JURNAL PASOPATI : PENGABDIAN MASYARAKAT DAN INOVASI PENGEMBANGAN TEKNOLOGI , Vol 3, No 3 (2021)

2021

0 cited

Beban maksimum, tegangan, lendutan dan momen curvatur pada variasi jembatan beton balok t dengan menggunakan software response 2000

S4

KONSTRUKSIA , Vol 13, No 1 (2021): Jurnal Konstruksia Vol 13 No. 1 Tahun 2021 , pp. 113–127

2021

0 cited

Optimization of changes methods of bamboo piles into pvd ahmad yani airport project

S4

CIVED , Vol 7, No 1 (2020): Maret 2020 , pp. 11-25

2020

0 cited

Edukasi building information modeling (bim) pada kontraktor kecil

NA

JURNAL PASOPATI : PENGABDIAN MASYARAKAT DAN INOVASI PENGEMBANGAN TEKNOLOGI , Vol 2, No 3 (2020)

2020

0 cited

Supply chain in the construction industry: micro, meso, macro

S4

JACEE (JOURNAL OF ADVANCED CIVIL AND ENVIRONMENTAL ENGINEERING) , Vol 3, No 2 (2020): October , pp. 50-57

2020

0 cited

Supply chain performance measurement framework for construction materials: micro meso macro

S2

JURNAL OPTIMASI SISTEM INDUSTRI , Vol. 19 No. 2 (2020): Published in November 2020 , pp. 101-110

2020

0 cited

Aplikasi green building berdasarkan metode edge

S4

WAHANA TEKNIK SIPIL: JURNAL PENGEMBANGAN TEKNIK SIPIL , Vol 25, No 2 (2020): Wahana Teknik Sipil , pp. 98-111

2020

0 cited

Strategi percepatan proyek menggunakan metode crash program (studi kasus : program kerja masa pengeringan proyek rehabilitasi saluran induk klambu kiri tahun 2017)

S4

WAHANA TEKNIK SIPIL: JURNAL PENGEMBANGAN TEKNIK SIPIL , Vol 25, No 2 (2020): Wahana Teknik Sipil , pp. 166 - 185

2020

0 cited