Asri Nurdiana, S.T, M.T

Biography

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Risk study on supply chain management in construction (case study: building projects in indonesia)

IOP CONFERENCE SERIES: MATERIALS SCIENCE AND ENGINEERING 669 (1), 012042, 2019

Authors: A Nurdiana, MN Sholeh

2019

3 cited

Hexalock brick: inovasi batako pendukung konsep pre-febricate building yang ringan, ekonomis dan ramah lingkungan

JURNAL PROYEK TEKNIK SIPIL 2 (1), 25-30, 2019

Authors: SA Nugroho, MD Fadilah, TB Ginting, A Nurdiana

2019

2 cited

Analisis kelayakan usaha pengasapan ikan di desa toolawawo kecamatan lalonggasumeeto kabupaten konawe

JURNAL SOSIAL EKONOMI PERIKANAN 1 (2), 85-97, 2018

Authors: CM Hapsari, S Yusuf, N Azis

2018

8 cited

Mapping of information and identification of construction waste at project life cycle

AIP CONFERENCE PROCEEDINGS 1941 (1), 020049, 2018

Authors: MA Wibowo, NU Handayani, A Nurdiana, MN Sholeh, GS Pamungkas

2018

5 cited

An analysis of antioxidants, organoleptics and hedonics with variations of boiling time in jasmine tea and jasmine root tea a study on kaliprau, pemalang

JOURNAL OF PHYSICS: CONFERENCE SERIES 1025 (1), 012066, 2018

Authors: F Arifan, S Winarni, G Handoyo, A Nurdiana, S Risdiyanti

2018

3 cited

Aplikasi manajemen risiko pada proyek jalan tol semarang-solo ruas bawen-solo

JURNAL PROYEK TEKNIK SIPIL 1 (1), 21-28, 2018

Authors: A Nurdiana, B Setiabudi

2018

0 cited

Risk management in indonesia construction project: a case study of a toll road project

RISK MANAGEMENT TREATISE FOR ENGINEERING PRACTITIONERS, 2018

Authors: MA Wibowo, JUD Hatmoko, A Nurdiana

2018

2 cited

Identification of risk factors cause cost overrun at toll road project

ADVANCED SCIENCE LETTERS 24 (12), 9534-9536, 2018

Authors: A Nurdiana, R Susanti, F Suwarto

2018

1 cited